Constelada (Emerita) is HAB's move-in ready Riviera Maya inventory. Architecture, finishes, and amenities — all delivered. Buyers close, get the keys, and start renting that quarter. Direct 15-year financing or mortgage.
Constelada · curated by HAB Group Consulting
Total units, finite supply
Four-level buildings
Designed footprint
Higher nightly rate vs. generic Tulum stock
Three reasons the cash-flowing buyer picks Constelada over a 2026 pre-sale.
You're not waiting 14 months for keys. Constelada is delivered, finished, ready. The unit goes on the booking platform the week you close.
15-year direct financing from the developer, or standard mortgage. Either route gets you in with capital intact for furnishings + reserves.
56 units. Three buildings. Once the prime corner / top-floor / pool-view units sell, the back inventory is what's left for the rest of the cycle. There is no Phase 2. The math compresses fast.
Most Tulum-area inventory hitting the market is pre-sale with 2026 or 2027 delivery dates. That model works — but every quarter waiting for keys is a quarter of carrying costs without revenue.
Constelada is the opposite. The buyer signs, closes, gets keys, and the unit is generating bookings before the next quarterly Airbnb cohort even forms. The IRR math is cleaner because there's no 14-month dead period in the spreadsheet.
Add 15-year direct developer financing or standard hipotecario, and the leverage stack works for cash-flow buyers, second-home buyers, and reservation-driven operators alike.
Spaces that photograph well and live well. Real interiors from the delivered units.
Riviera Maya — the address that drives nightly rate and review velocity in this market.
Material choices that lift listing photos into the top decile of the local comp set.
Shared spaces that earn the property a 5-star review — pool, lounge, the lifestyle stack.
Standard HAB structure: down at signing, monthly progress, balance at delivery. Exact figures per unit on the brochure — talk to Samantha for the live unit availability matrix.
Locks the unit, the floor, and the orientation. Fideicomiso paperwork begins in parallel.
Spread across the construction window. Pre-delivery walkthrough scheduled before hand-over.
Keys, fideicomiso registered, condo regime in place. Ready to occupy or rent immediately.
Yes — through a fideicomiso (bank trust) for properties within the restricted coastal zone. Tulum qualifies. Standard practice for the last 50+ years. We work with the same fideicomiso bank across HAB so the process is clean and repeatable.
Down payment at signing, monthly progress payments through construction, balance at delivery (Move-in ready). Specifics vary by unit; Samantha will pull the exact schedule for any unit on a 20-min call.
Move-in ready. Constelada is delivered and operational right now — you can rent or occupy immediately into the 2026–27 high season.
DarKitectos is the studio behind some of Tulum's most distinctive recent developments. The mindfulness brief shows up structurally — light wells, sound separation between units, indoor-outdoor flow, biophilic material palette. The result rents at the top decile of Tulum nightly comps from day one.
On certain units, yes — the pre-delivery walkthrough is structured to allow finish input where construction stage permits. Earlier reservation = more decision points. Ask Samantha which units still have finish-selection windows open.
Resale-before-delivery is allowed and HAB has helped buyers do this when life changes. Constelada's near-ready timeline actually makes pre-delivery resale particularly clean — pricing is generally favorable to early buyers.
No. HAB has a property-management arm if you want it, but you're free to use any Tulum operator you prefer. We can refer the operators we've seen produce the highest gross-yield numbers on similar stock.
Tell us what unit profile you want and we'll send the live availability matrix + payment scheme within 24 hours. Or book a 20-minute call with Samantha and walk the floor plans together.